Dredging Services South Africa

PROJECTS

AMANDELBULT

The capacity of the dam was 21000 cubic meters and we removed about twice that amount during the 9 months we were on site there.The dam is 4.5m deep and project was challenging. Special brackets over the walls to fit winch system had to be made. The slurry regress was responsible for length of the project, which was why we removed about twice as much slurry as the capacity of the pond.

ROODEPLAAT WATER TREATMENT PLANT

Project was for removal of 20000 cubic meters of organic material. This was pumped through a poly dosing system into Geotube bags for dewatering purposes.

ANGLO PLATINUM

Info to follow.

PROCESS OF A WASTE WATER PLANT